Quality Improvement:-

In 2010-11, 87.42 % conformed to billed grade for dispatches of coal covered under agreed sampling arrangement as compared to 85.81 % grade confirmation achieved in 2009-10 on sampled quantity.

Details 20010-11 2009-10
No. of Samples drawn
11086
9828
No. of samples conformed to billed grade
9236
8163
% of Grade conformation
83.31
83.06
No. of samples with one grade slippage.
1673
1620
% of one grade slippage
15.09
16.48
No. of samples with two grade slippage & more
123
40
% of two grade slippage & more
1.11
0.41
 
Quality deduction:

Although the Grade confirmation has increased by 1.61% during 2010-11 compared to 2009-10, quality deduction in 2010-11 was Rs. 42.18 per tonne compared to Rs. 30.90 per tonne in 2009-10. This is because of revision of coal prices and also due to more quantity of coal dispatched under MoU during 2010-11.


Year
Total quantity dispatched
(Rail & Road)
(in Lakh tonne)
Amount of Deduction
(in Lakh Rs.)
Deduction
Rs./Tonne
2010-11
292.01
12317.39
42.18
2009-10
273.02
8437.25
30.90

(N.B.: Amounts calculated on the basis of basic price of RoM (250mm) coal.)

WEIGHMENT & SIZING  STATUS:

WEIGHMENT STATUS :


In 2010-11, quantity weighed in EPS for supplies a/c Power houses & others    compared to last year could be seen from the table below:

(Figure in L/T)
Details
2010-11 2009-10
Power EPS Other Consumers Total Power EPS
Other Consumers
Total
Qnty. Despatched (by Rail)
261.63
13.22
274.85
249.11 16.66
265.77
Qnty. Weighed under EPS
257.71
13.18
270.89
245.57 16.66
262.23
Weighment % under EPS
98.50
99.71
98.56
98.58
100.00
98.67

SIZING STATUS :

Out of total dispatches in 2010-11, 229.49 lakh tonne of coal dispatched to Power Sector was sized (-250mm) by CHP/FB/UG (87.71%) compared to 231.24 lakh tonne in 2009-2010 (92.83%). Dispatches from sidings not having CHP/FB facility, sizing was done by Dozer. To achieve supply of 100% crushed coal to power houses, action is being initiated in a few areas to award contracts for transportation of crushed coal (through mobile crusher) from pitheads to loading points.


Details
2010-11
2009-10
Power
Other
Total
Power
Other
Total
Qnty. Sized in CHP/FB (L/T)
229.49 8.06 237.55 231.24 12.84 244.08
%
87.71 60.94 86.43 92.83 77.08 91.84

STATUS OF DISPUTES RESOLVED THROUGH UMPIRE:

Till March, 1995, final award received for interest claim for delay in payment is Rs. 11.29 crore. The amount was referred to “Ministry of Law” by UPSEB. Secretary/ Law, Govt. of India has rejected UPSEB petition. Claim has been submitted for payment of interest. However, UPRVUNL has appealed to Lucknow Bench of Allahabad High Court for relief.









Home Contact Us Site Map
Copyright © 2009 EASTERN COALFIELDS LIMITED
DISCLAIMER :
Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
Sanctoria, Post:Dishergarh, Dist. Burdwan-713333, W.B, India  ~ Tel:0341-2520052-53,2520414 ~ Fax:0341-2523574 ~ Gram:EASTCOAL.