QUALITY CONTROL
Quality Improvement:-
In 2010-11, 87.42 % conformed to billed grade for dispatches of coal
covered under agreed sampling arrangement as compared to 85.81 % grade
confirmation achieved in 2009-10 on sampled quantity.
| Details |
20010-11 |
2009-10 |
No.
of Samples drawn
|
11086
|
9828
|
No.
of samples conformed to billed grade
|
9236
|
8163
|
%
of Grade conformation
|
83.31
|
83.06
|
No.
of samples with one grade slippage.
|
1673
|
1620
|
%
of one grade slippage
|
15.09
|
16.48
|
No.
of samples with two grade slippage & more
|
123
|
40
|
%
of two grade slippage & more
|
1.11
|
0.41
|
Quality
deduction:
Although the Grade
confirmation has increased by 1.61% during 2010-11 compared to 2009-10,
quality deduction in 2010-11 was Rs. 42.18 per tonne compared to Rs.
30.90 per tonne in 2009-10. This is because of revision of coal prices
and also due to more quantity of coal dispatched under MoU during
2010-11.
Year
|
Total
quantity dispatched
(Rail & Road)
(in Lakh tonne)
|
Amount
of Deduction
(in Lakh Rs.)
|
Deduction
Rs./Tonne
|
2010-11
|
292.01
|
12317.39
|
42.18
|
2009-10
|
273.02
|
8437.25
|
30.90
|
(N.B.: Amounts calculated on the basis of basic
price of RoM (250mm) coal.)
WEIGHMENT
& SIZING STATUS:
WEIGHMENT
STATUS :
In 2010-11, quantity weighed in EPS for supplies a/c Power houses &
others compared to last year could be seen from the
table below:
(Figure in L/T)
Details
|
2010-11 |
2009-10
|
| Power
EPS |
Other
Consumers |
Total
|
Power
EPS
|
Other
Consumers
|
Total
|
Qnty.
Despatched (by Rail)
|
261.63
|
13.22
|
274.85
|
249.11 |
16.66
|
265.77 |
Qnty.
Weighed under EPS
|
257.71
|
13.18
|
270.89
|
245.57 |
16.66
|
262.23 |
Weighment %
under EPS
|
98.50
|
99.71
|
98.56
|
98.58
|
100.00
|
98.67 |
SIZING
STATUS :
Out of total dispatches
in 2010-11, 229.49 lakh tonne of coal dispatched to Power Sector was
sized (-250mm) by CHP/FB/UG (87.71%) compared to 231.24 lakh tonne in
2009-2010 (92.83%). Dispatches from sidings not having CHP/FB facility,
sizing was done by Dozer. To achieve supply of 100% crushed coal to
power houses, action is being initiated in a few areas to award
contracts for transportation of crushed coal (through mobile crusher)
from pitheads to loading points.
Details
|
2010-11
|
2009-10
|
Power
|
Other
|
Total
|
Power
|
Other
|
Total
|
Qnty.
Sized in CHP/FB (L/T)
|
229.49 |
8.06 |
237.55 |
231.24 |
12.84 |
244.08 |
%
|
87.71 |
60.94 |
86.43 |
92.83 |
77.08 |
91.84 |
STATUS
OF DISPUTES RESOLVED THROUGH UMPIRE:
Till March, 1995, final award received
for interest claim for delay in payment is Rs. 11.29 crore. The amount
was referred to “Ministry of Law” by UPSEB. Secretary/ Law, Govt. of
India has rejected UPSEB petition. Claim has been submitted for payment
of interest. However, UPRVUNL has appealed to Lucknow Bench of
Allahabad High Court for relief.
|
|
|
|
|
|
|
Home |
Contact
Us |
Site
Map |
Copyright
©
2009 EASTERN
COALFIELDS
LIMITED
DISCLAIMER
:
Information on this site is believed to be accurate but ECL disclaims
any liability for any errors or omissions that may occur from time to
time. |
| Sanctoria,
Post:Dishergarh, Dist. Burdwan-713333, W.B, India ~
Tel:0341-2520052-53,2520414 ~ Fax:0341-2523574 ~ Gram:EASTCOAL. |
|
|
|